The Kitchen!

This is the one I have been asked about the most. Even my mom and sister haven’t seen pictures. Linda and Jack saw the cabinets without countertops when they were first installed. But now, I’ll show what we have of the kitchen so far.

The fridge still needs to be put in place, the backsplash and floor need to be installed. That won’t happen until January. I just got word the other day that the floor tiles are arriving at the Port of Long Beach next week (yay!) and I still need to choose the backsplash tile — you would not believe how many options there are for matte white subway tiles!

We’re using it now, so it’s already way messier. Once the tiles are in, I’ll clean it really well and do a good final photo shoot.

In the mean time, it’s the pictures you want, so here they are:

The upper cabinets where glass is going to go. Aren’t the curves pretty?

IMG_1239

IMG_1228

IMG_1226

IMG_1233

IMG_1225

IMG_1224

The old sink all cleaned up with new matte black fixtures.

IMG_1254

IMG_1253

IMG_1252

<;img class=”alignnone size-full wp-image-1501″ alt=”IMG_1227″ src=”https://springtreehouse.files.wordpress.com/2012/12/img_1227.jpg” height=”750″ width=”500″ />;

IMG_1223

IMG_1240

update the fridge is in place and I got word that the floor tiles are on their way, all 1150 lbs of them!

Also, I’ve decided on a backsplash tile: a basic Daltile matte white 3×6 that’s <$5/sq ft, made in the USA, and in stock. Can't really best that.

Advertisements

One comment on “The Kitchen!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s